— Advertisement —

Fairview/Fairview changes almost complete

From the 60% design plans

We first wrote about the proposed changes to the intersection of Fairview Ave N and Fairview Ave E back in October 2010. Currently under construction, the project is scheduled to open Friday.

While the project is mostly about walking safety, it is also part of a key bike route and involves some bicycling improvements. People headed northbound on the Cheshiahud Loop “Trail” should find it easier and safer to make a left turn onto Fairview Ave E (which I personally prefer to Eastlake Ave as a route through Eastlake and to the University Bridge). Remember—though it does not make much sense—Fairview Ave E is north of Fairview Ave N.

The project also includes a new bike lane on Fairview Ave N between Eastlake Ave and the short bridge just south of Fairview Ave E. I assume this bike lane will connect to the existing protected biking and walking lane across the bridge.


— Advertisement —

The primary problem addressed, however, is the huge crossing distance for people walking on the west side of Fairview Ave N, the most direct way to walk between the Eastlake neighborhood and South Lake Union/Downtown. If you look at the Google Map below, you can see how much safer and more comfortable it will be for people on foot.

The plans also include a new sidewalk for people on the south side of Fairview Ave N.

Here’s the Google Map of the intersection:


View Larger Map

The 60% design documents:

Fairview 60 Percent Design


About the author:


Related posts:

— Advertisement —

Join the Seattle Bike Blog Supporters

As a supporter, you help power independent bike news in the Seattle area. Please consider supporting the site financially starting at $5 per month:


Latest stories

Bike Events Calendar

May
4
Sat
9:00 am First Saturday Neighborhood Clea…
First Saturday Neighborhood Clea…
May 4 @ 9:00 am – 12:00 pm
Every month volunteers gather to collect garbage and help beautify our neighborhood. On average, we collect about 15 bags of garbage per clean up, which means 1,000’s of small pieces of plastic that do not[…]
May
7
Tue
6:30 pm West Seattle Bike Connections mo… @ Online
West Seattle Bike Connections mo… @ Online
May 7 @ 6:30 pm – 8:00 pm
 ShareMastodonTwitterFacebookRedditEmail
May
8
Wed
6:00 pm Monthly SPAB Meeting @ Virtual meeting
Monthly SPAB Meeting @ Virtual meeting
May 8 @ 6:00 pm – 8:00 pm
http://www.seattle.gov/spab/ShareMastodonTwitterFacebookRedditEmail
May
9
Thu
4:45 pm Fix the Burke-GIlman Advocacy Ride @ Seattle Parks and Recreation Bldg
Fix the Burke-GIlman Advocacy Ride @ Seattle Parks and Recreation Bldg
May 9 @ 4:45 pm – 8:00 pm
There is going to be an advocacy ride to the Board of Park and Recreation Commissioners meeting at 6:30 pm on Thursday, May 9th. The goal is to get as many bicyclists as possible to[…]
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
May 9 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…