— Advertisement —

New South Lake Union park brings Cheshiahud Loop closer to completion


With the opening of Lake Union Park in South Lake Union, the Cheshiahud Loop comes closer to completion. The park connects to the Westlake Ave path/parking lot, allowing bikes and pedestrians a nice cut through the park instead of battling with the mess that is Valley St.

But first, some thoughts on the park. It’s a wonderful space, with access to the water, a great view of Gas Works Park and North Seattle, a nice new bridge and a pond for playing with model boats. There seems to be a lot of somewhat lost green space in the center of the park. Even at the opening, when the park was packed with people, almost no one was using much of the grassy area in the center. But perhaps people will figure out what to do with the space as time goes on.

Valet bike parking

The opening celebration featured some cool bike-centric stuff, like valet bike parking (“Garçon! My velocipede, please.”) and bike-powered spin art for kids:


— Advertisement —

Another nice part about this park is that it makes the Cheshiahud Loop around Lake Union quite pleasant, with Lake Union and Gas Works parks bookending the ride. Some friends and I rode the loop ride two nights ago, and it was totally awesome. Before I hated riding through South Lake Union. Now only most of it sucks.

But, there are more plans in the works. The city announced funding to make changes to the intersection of Fairview N and Fairview E last week as one of the Neighborhood Street Fund projects. A reworking of Terry Ave, which is somewhat in the works, would make it easier to access downtown by riding through the heart of South Lake Union from the new park. Unfortunately, the sidewalk — ahem, excuse me … “trail” — along Fairview Ave N from Valley to Fairview Ave E is completely unacceptable and dangerous.

If you have ridden to the park, let us know your thoughts in the comments. Check out SDOT’s conceptual drawings for improvements to the Cheshiahud Loop.
CLUL Concepts


About the author:


Related posts:

Comments

One response to “New South Lake Union park brings Cheshiahud Loop closer to completion”

  1. david

    it’s important to note that a lot of the grassy areas in the park were only recently seeded, and were cordoned off from use. i suspect that once all the vegetation grows in, folks will use the greenspace pretty intensively. as for the gravel areas on the south side of the park, i think the design is a little lacking. i think it’s supposed to be modeled after a parisian style park, but when it’s that close to the parking lot it sort of just feels like an extension of the lot. then again, it works great as a staging area, space for vendors to set up their booths, and a loading/unloading area; for a greenspace that will likely be heavily programmed, that kind of utilitarian space probably makes a whole lot of sense.

— Advertisement —

Join the Seattle Bike Blog Supporters

As a supporter, you help power independent bike news in the Seattle area. Please consider supporting the site financially starting at $5 per month:


Latest stories

Bike Events Calendar

Jun
18
Tue
6:00 pm South Seattle Safe Streets Coali… @ Virtual via Zoom
South Seattle Safe Streets Coali… @ Virtual via Zoom
Jun 18 @ 6:00 pm – 7:30 pm
Joint meeting between Rainier Valley Greenways & Beacon Hill Safe Streets.ShareMastodonTwitterFacebookRedditEmail
Jun
20
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Jun 20 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Jun
23
Sun
1:00 pm Redmond History Ride @ Marymoor Park Velodrome Parking Lot
Redmond History Ride @ Marymoor Park Velodrome Parking Lot
Jun 23 @ 1:00 pm – 4:30 pm
Redmond History Ride @ Marymoor Park Velodrome Parking Lot | Redmond | Washington | United States
Join this 13 mile bike ride around Redmond at a Leisurely pace. We’ll visit various sites both old and new as I tell stories about the city that was once known as Salmonberg.ShareMastodonTwitterFacebookRedditEmail
Jun
24
Mon
5:30 pm Downtown Greenways monthly meeting
Downtown Greenways monthly meeting
Jun 24 @ 5:30 pm – 7:00 pm
Last Monday of the month.  Join us! https://seattlegreenways.org/downtowngreenwaysShareMastodonTwitterFacebookRedditEmail
Jun
26
Wed
6:00 pm Ballard-Fremont Greenways Meeting
Ballard-Fremont Greenways Meeting
Jun 26 @ 6:00 pm – 7:30 pm
Ballard-Fremont Greenways meets monthly on the 4th Wednesday of the month. Join the google group for monthly meeting information: https://groups.google.com/g/ballard-greenwaysBring your enthusiasm and ideas to share with the group or just stop in to say hello[…]
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…