— Advertisement —

Bike Route Alert 6/6: Return of the Montlake Blvd detour

Map of the soon-to-be closed trail under SR 520 east of Montlake Blvd.
Map of the soon-to-be-closed trail from WSDOT.

Photo of a person biking on the trail near the bridge.The trail under the 520 Bridge east of Montlake Boulevard will close permanently June 6 as crews begin work on a new biking and walking bridge over the freeway, according to WSDOT.

The trail opened in March 2020 and was labeled as a temporary route, but it was very welcome at the time. After crews closed the 24th Ave E bridge, which had formerly been the primary bike route, the biking and walking detour to Montlake Blvd was not great. The old skinny sidewalk was sorely inadequate for a two-way biking and walking route, and the state chose not to make extra space on the boulevard to make the detour better.

Unfortunately, people will once again need to detour to Montlake Blvd for an extended period of time. This time, however, they will detour to an under-construction Montlake Blvd. as crews work to significantly expand the roadway as part of the $4.51 billion freeway expansion project (the total climbs to $5.11 billion when you add in the “Rest of the West” connection to Roanoke and I-5). Hopefully the biking and walking detour will not be as stressful as before, though that remains to be seen.


— Advertisement —

People will be need to deal with a detour until the new biking and walking bridge or the new path along 24th Ave E are open, currently scheduled for full completion in 2023. Hopefully a usable alternative will open as soon as possible.

concept map of the final project.
The finished project.

About the author:


Related posts:

— Advertisement —

Join the Seattle Bike Blog Supporters

As a supporter, you help power independent bike news in the Seattle area. Please consider supporting the site financially starting at $5 per month:


Latest stories

Bike Events Calendar

Apr
24
Wed
6:00 pm Ballard-Fremont Greenways Meeting
Ballard-Fremont Greenways Meeting
Apr 24 @ 6:00 pm – 7:30 pm
Ballard-Fremont Greenways meets monthly on the 4th Wednesday of the month. Join the google group for monthly meeting information: https://groups.google.com/g/ballard-greenwaysBring your enthusiasm and ideas to share with the group or just stop in to say hello[…]
6:00 pm NE Seattle Greenways Meeting
NE Seattle Greenways Meeting
Apr 24 @ 6:00 pm – 7:00 pm
 ShareMastodonTwitterFacebookRedditEmail
Apr
25
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Apr 25 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Apr
28
Sun
all-day McClinchy Camano Classic Century @ Stanwood Middle School
McClinchy Camano Classic Century @ Stanwood Middle School
Apr 28 all-day
McClinchy Camano Classic Century @ Stanwood Middle School | Stanwood | Washington | United States
Bike Camano Island for 40th edition of classic ride! The McClinchy Camano Classic Century offers scenic and challenging route options of 103, 65, 50, 35 or 15 miles. Fresh food stops, mechanical support and gourmet[…]
Apr
29
Mon
5:30 pm Downtown Greenways monthly meeting
Downtown Greenways monthly meeting
Apr 29 @ 5:30 pm – 7:00 pm
Last Monday of the month.  Join us! https://seattlegreenways.org/downtowngreenwaysShareMastodonTwitterFacebookRedditEmail
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…