— Advertisement —

Trail Alert 2/12-14: Eastrail closure near I-405/SR-520 interchange

Map of the closure and detour route. Detour description: In order to continue through to 120th Avenue Northeast, you'll need to follow the following detour (Coming from the north, at the South Kirkland Park-and-Ride): Detour off the trail to the existing bike lane/sidewalk on 108th Avenue Northeast to Northup Way Use existing bike lane/sidewalk on Northup Way/20th Avenue Northeast Head south on 120th Avenue Northeast to Spring Boulevard intersection.Sound Transit is resurfacing a stretch of the Eastrail between the South Kirkland Park and Ride and the intersection of 120th Ave NE and Spring Blvd in Bellevue. So anyone trying to get through will have to detour via Northrup Way and 120th Ave NE.

Construction is scheduled to close the trail Wednesday through Friday, though of course at this time of year work is rather weather-dependent.

Details from Sound Transit:


— Advertisement —

Staring Wednesday, Feb. 12, Sound Transit’s contractor, Hensel Phelps, will close a small portion of the Eastrail in Bellevue, for three days, near the construction site of the Operations and Maintenance Facility on 120th Avenue Northeast. The closure is needed to complete trail surfacing and reconstruct the temporary trail bridge.

What

Three-day trail closure and detour

When

Wednesday, Feb. 12, through Friday, Feb. 14

Where

Eastrail near the Operations and Maintenance Facility East construction site on 120th Avenue Northeast in Bellevue.

More

  • In order to continue through to 120th Avenue Northeast, you’ll need to follow the following detour (Coming from the north, at the South Kirkland Park-and-Ride):
    • Detour off the trail to the existing bike lane/sidewalk on 108th Avenue Northeast to Northup Way
    • Use existing bike lane/sidewalk on Northup Way/20th Avenue Northeast
    • Head south on 120th Avenue Northeast to Spring Boulevard intersection
  • Plan ahead, leave early and allow extra time to reach your destination.

About the author:


Related posts:

— Advertisement —

Join the Seattle Bike Blog Supporters

As a supporter, you help power independent bike news in the Seattle area. Please consider supporting the site financially starting at $5 per month:


Latest stories

Bike Events Calendar

Apr
24
Wed
6:00 pm Ballard-Fremont Greenways Meeting
Ballard-Fremont Greenways Meeting
Apr 24 @ 6:00 pm – 7:30 pm
Ballard-Fremont Greenways meets monthly on the 4th Wednesday of the month. Join the google group for monthly meeting information: https://groups.google.com/g/ballard-greenwaysBring your enthusiasm and ideas to share with the group or just stop in to say hello[…]
6:00 pm NE Seattle Greenways Meeting
NE Seattle Greenways Meeting
Apr 24 @ 6:00 pm – 7:00 pm
 ShareMastodonTwitterFacebookRedditEmail
Apr
25
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Apr 25 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Apr
28
Sun
all-day McClinchy Camano Classic Century @ Stanwood Middle School
McClinchy Camano Classic Century @ Stanwood Middle School
Apr 28 all-day
McClinchy Camano Classic Century @ Stanwood Middle School | Stanwood | Washington | United States
Bike Camano Island for 40th edition of classic ride! The McClinchy Camano Classic Century offers scenic and challenging route options of 103, 65, 50, 35 or 15 miles. Fresh food stops, mechanical support and gourmet[…]
Apr
29
Mon
5:30 pm Downtown Greenways monthly meeting
Downtown Greenways monthly meeting
Apr 29 @ 5:30 pm – 7:00 pm
Last Monday of the month.  Join us! https://seattlegreenways.org/downtowngreenwaysShareMastodonTwitterFacebookRedditEmail
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…