— Advertisement —

Seattle is now accepting private bike share permits, first bikes could hit streets in a week or two

Spin is one of the companies that hopes to be among the first to operate in Seattle.

Bike share is coming back to Seattle.

SDOT just released its permit application (PDF) for a six-month pilot program. Staff says companies should expect one to two weeks for their permits to be processed. Once approved, companies can start putting bikes on the streets and turn on their apps.

The final rules are not too much different from the draft rules we reported about a couple weeks ago. The permit prices have moved around a bit ($15 per bike instead of $23) and the data sharing rules have changed to allow companies to share data directly with the UW Transportation Data Collaborative instead of sending it to the city.


— Advertisement —

Spin, one of the companies hoping to be among the first to get up and running in Seattle, was ready right away to send out a press release praising the rules:

“We are thrilled about the release of SDOT’s new bikeshare regulations,” the company said in a statement. “SDOT’s forward thinking transportation policies bring us one step closer to offering Spin’s affordable, equitable smart stationless bikeshare system to all neighborhoods across Seattle.”

For SDOT’s part, they aren’t ignoring Pronto’s failures. Instead, they are pitching the new permits as “bike share 3.0” in Seattle. The official SDOT page about the bike share permits even includes this image:

Here’s the full SDOT press release:

Today, the Seattle Department of Transportation (SDOT) launched a new pilot program that provides permitting requirements for privately-owned bike share companies to operate in the city and provide an additional transit option for residents and visitors.  

“Three years ago, we launched a citywide bike share program in Seattle. And, no It didn’t work. But our SDOT team never stopped working to deliver on our commitment to provide a bike share mobility option,” said SDOT Director Scott Kubly. “We want to give residents as many transportation options as we can to get around our growing city. This effort gives us the flexibility to collect ridership data as well as provide a low-cost transit option without public funding.”  

Here’s how the pilot works:  

  • Bike share companies interested in operating in Seattle, must apply to SDOT’s pilot permit program. 
  • Each must be able to show a demonstrated ability to meet requirements for safety and operations in Seattle.
  • Successful applicants will be permitted to operate for six months. 
  • At the end of the pilot, SDOT will analyze bike rental data and performance metrics, which include several measures such as safety, operations, and neighborhood distribution equity.  
  • SDOT will then evaluate the performance and efficiency of the pilot and determine if it meets the standards to become a permanent transit program.  

SDOT is especially pleased with a protection feature within the new regulations that enable the department to protect all of the private data that’s collected through bike rentals, ensuring that riders get the best and safest service from bike share operators. 

The pilot also gives SDOT the ability to test the feasibility and effectiveness of dockless bike share.  At the end of the day, it all boils down to what best serves Seattle’s 700,000 residents, and the millions of visitors who move about the city daily. And SDOT is eager to find the best bike share option for Seattleites.   

Interested in applying for a bike share permit? 

Visit http://www.seattle.gov/transportation/bikeshare.htm.


About the author:

Tags:


Related posts:

Comments

4 responses to “Seattle is now accepting private bike share permits, first bikes could hit streets in a week or two”

  1. Ben

    Why did it take so long? If pronto was dead it seems we could have had private share a year ago.

    1. William

      Well I am sure that if it is a success, that SDOT will do its very best to regulate it out of viability

    2. JTinWS

      Pronto only shut down in March. I’m frankly amazed at how quickly these private ones are rolling out, less than 4 months later. I think that having several companies could actually be complementary to each other — I’m more likely to make a trip without my car into a transit-weak area via any bikeshare company if I know that 2 or 3 different companies might have a bike nearby to make my return trip. This is a super exciting development!

  2. […] public transit.  Similar data sharing policies like Seattle’s Bike Share program policy (Seattle Bike Blog, 2017) has allowed for partnerships with educational facilities to meet their mission of providing […]

— Advertisement —

Join the Seattle Bike Blog Supporters

As a supporter, you help power independent bike news in the Seattle area. Please consider supporting the site financially starting at $5 per month:


Latest stories

Bike Events Calendar

Apr
24
Wed
6:00 pm Ballard-Fremont Greenways Meeting
Ballard-Fremont Greenways Meeting
Apr 24 @ 6:00 pm – 7:30 pm
Ballard-Fremont Greenways meets monthly on the 4th Wednesday of the month. Join the google group for monthly meeting information: https://groups.google.com/g/ballard-greenwaysBring your enthusiasm and ideas to share with the group or just stop in to say hello[…]
6:00 pm NE Seattle Greenways Meeting
NE Seattle Greenways Meeting
Apr 24 @ 6:00 pm – 7:00 pm
 ShareMastodonTwitterFacebookRedditEmail
Apr
25
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Apr 25 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Apr
28
Sun
all-day McClinchy Camano Classic Century @ Stanwood Middle School
McClinchy Camano Classic Century @ Stanwood Middle School
Apr 28 all-day
McClinchy Camano Classic Century @ Stanwood Middle School | Stanwood | Washington | United States
Bike Camano Island for 40th edition of classic ride! The McClinchy Camano Classic Century offers scenic and challenging route options of 103, 65, 50, 35 or 15 miles. Fresh food stops, mechanical support and gourmet[…]
Apr
29
Mon
5:30 pm Downtown Greenways monthly meeting
Downtown Greenways monthly meeting
Apr 29 @ 5:30 pm – 7:00 pm
Last Monday of the month.  Join us! https://seattlegreenways.org/downtowngreenwaysShareMastodonTwitterFacebookRedditEmail
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…