— Advertisement —

Expect Montlake Bridge delays and detours this weekend

20140318_MAP_UWS_BikeIt’s gonna be quite a weekend for disruptions on and around the Montlake Bridge.

Expect detours and delays as construction on the UW Link Light Rail Station works on the sidewalk on the east side of Montlake Boulevard. Though work times could change due to weather, the plan is for the sidewalk to close at 7 p.m. tonight and will not open until Saturday evening.

Then on Sunday, a crew filming a commercial for Humana Healthcare in the morning. The filming may require delays.


— Advertisement —

Details on the sidewalk work, from Sound Transit:

Temporary sidewalk and lane closures on the east side of Montlake Blvd.

Beginning this Thursday March 27, through Saturday, March 29, Sound Transit’s contractor will restore the sidewalk and curbs on the eastside of the intersection at Montlake Blvd. and NE Pacific Street.  In order to do this work, crews must intermittently close one northbound traffic lane and the east sidewalk south of the intersection of Montlake Blvd. and NE Pacific Street.

To minimize traffic impacts, the lane closure will be in effect from Thursday, March 27, 7 p.m. through 3 a.m. and Friday, March 28, from 7 p.m. through 5 p.m. Saturday, March, 29*.
Signage and flaggers will help direct pedestrians and bicyclists around the work.
Crosswalks across Montlake Blvd. at NE Pacific Street will remain open.

Details on the Sunday morning filming:

WHO:    O POSITIVE

WHAT:    HUMANA HEALTHCARE TV COMMERCIAL

WHERE:    MONTLAKE BRIDGE

FILMING ACTIVITY DATE(S):    Date:    MARCH 30, 2014
Time:   5:00AM to  8:00PM

Neighbors please note: Dates and times are best estimates and subject to change due to the many variables inherent in the filming process.  The production will do its best to give notice of changes, should any occur.
.

DESCRIPTION OF PRODUCTION ACTIVITIES:

Commercial film production Company O Positive will be filming scenes on and around the Montlake Bridge this Sunday morning, March 30th.

Closures and Detours:  The Montlake Bridge will be closed from 5AM – 9AM for the filming, and will be opened at various times for approximately 20 minutes, and lowered to clear traffic for at least 30 minutes between openings, from 9AM to 8PM.  The production will place approximately 20 “picture cars” along the street to create the traffic jam on both sides of the bridge during the filming, which will be captured as the bridge is raised and lowered multiple times.

The following ramps will be closed from 5AM to 9AM:
•    WB SR 520 ramp to SR 513
•    EB SR 520 ramp to SR 513 – the left turn lane will be closed

Advance notice of closure signs will be placed on the ramps and on SR 513 no later than Tuesday 3/25/14

Equipment:  Cameras for the filming will be hand-held, mounted on tripods and on a dolly track, placed in a boat and on a condor lift on the side of the road. A radio-controlled helicopter will capture aerial footage from 5AM through 8PM (flying over the water east and west of bridge; on Hwy 513 north side of the Montlake Bridge; over the Montlake Bridge looking down on the traffic and Bridge positions).  Radio-controlled helicopter will take off and land from West Montlake Park at the NW corner near the water, and along the waterway filming toward the bridge.

Traffic:  We are working with Seattle Police who will coordinate the full closure and intermittent vehicle and pedestrian traffic control during filming segments. Our production assistants will work with police and ask pedestrians to hold or take alternate routes around our shooting area for the shooting segments.


About the author:


Related posts:

— Advertisement —

Join the Seattle Bike Blog Supporters

As a supporter, you help power independent bike news in the Seattle area. Please consider supporting the site financially starting at $5 per month:


Latest stories

Bike Events Calendar

Apr
24
Wed
6:00 pm Ballard-Fremont Greenways Meeting
Ballard-Fremont Greenways Meeting
Apr 24 @ 6:00 pm – 7:30 pm
Ballard-Fremont Greenways meets monthly on the 4th Wednesday of the month. Join the google group for monthly meeting information: https://groups.google.com/g/ballard-greenwaysBring your enthusiasm and ideas to share with the group or just stop in to say hello[…]
6:00 pm NE Seattle Greenways Meeting
NE Seattle Greenways Meeting
Apr 24 @ 6:00 pm – 7:00 pm
 ShareMastodonTwitterFacebookRedditEmail
Apr
25
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Apr 25 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Apr
28
Sun
all-day McClinchy Camano Classic Century @ Stanwood Middle School
McClinchy Camano Classic Century @ Stanwood Middle School
Apr 28 all-day
McClinchy Camano Classic Century @ Stanwood Middle School | Stanwood | Washington | United States
Bike Camano Island for 40th edition of classic ride! The McClinchy Camano Classic Century offers scenic and challenging route options of 103, 65, 50, 35 or 15 miles. Fresh food stops, mechanical support and gourmet[…]
Apr
29
Mon
5:30 pm Downtown Greenways monthly meeting
Downtown Greenways monthly meeting
Apr 29 @ 5:30 pm – 7:00 pm
Last Monday of the month.  Join us! https://seattlegreenways.org/downtowngreenwaysShareMastodonTwitterFacebookRedditEmail
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…