— Advertisement —

Bellevue will celebrate new West Lake Sammamish Parkway trail Thursday

wlsp section.inddThe City of Bellevue will celebrate the completion of segment 1 of a big road construction project on West Lake Sammamish Parkway Thursday.

The project includes a new multi-use trail and new road surface. Construction is wrapping up on the first segment, which stretches from I-90 to SE 34th Street.

Details on the celebration:


— Advertisement —

Construction of the West Lake Sammamish Parkway Segment 1 will be complete in October 2013. To celebrate the completion of this project, the City of Bellevue and SAMBICA Summer Camp and Retreat Center are co-hosting a project celebration. Join us on Thursday, October 10, from 1 p.m. to 2:30 p.m. at SAMBICA Dining Hall, 4114 West Lake Sammamish Parkway Southeast. There will be a presentation at 1:15 p.m., followed by cake and refreshments.

More about the project in this video from Bellevue:


About the author:


Related posts:

Comments

6 responses to “Bellevue will celebrate new West Lake Sammamish Parkway trail Thursday”

  1. Todd

    I stumbled along this new project while returning from dinner one night in Issaquah. It’s pretty clear when you see a new bike lane going in. I think it’s great as arguably this was the most dangerous section of the entire length of the West Lake Sammamish route. When the East Lake Sammamish trail is finally and completely paved over the years, you’ll really have something.

  2. Gary

    The biggest problem was North bound.. from the looks of it, they put the new path on the East side, I do hope they don’t want us bicyclists to cross over and then back to use it when we are riding Southbound.

    The other big problem with this road is the Microsoft/Redmond commuter traffic heading South in the Evening and North in the morning. It backs up pretty badly, with just before it clogging up, a lot of speeding as folks rush to beat the backlog.

    1. MikeG

      From the diagram, the trail is on the West side. Northbound cyclists have a 4 foot shoulder on the east side of the street. I’d probably use the shoulder rather than cross the street to use the trail northbound.

  3. CL

    Looks like it may actually be an all ages and abilities trail – woohoo!

  4. Dave M.

    The northbound shoulder is a nice addition, but the southbound shoulder has been eliminated and replaced with a shared walkway/cycle tail. Now southbound cyclist are forced to merge onto the trail, reduce speed and share the tail with walkers, joggers and “all ages” cyclist going in both directions. A better option would have been to keep the shoulder for faster cyclist going south in addition to the separated trail.

    1. Maybe just putting in straight-up bike lanes that could double as pseudo-sidewalks? Is there enough width for either of these?

— Advertisement —

Bike Events Calendar

Aug
12
Sat
9:00 am Bike the 2 Line Stub @ Enatai Beach Park
Bike the 2 Line Stub @ Enatai Beach Park
Aug 12 @ 9:00 am
Bike the 2 Line Stub @ Enatai Beach Park | Bellevue | Washington | United States
Ride to check out future light rail stations in Bellevue & Redmond that may open early as part of a starter line being proposed. We’ll ride at casual (10-12 mph average on flats) pace, wait … Read more
10:00 am Friends on Bikes 2nd Saturday Ri…
Friends on Bikes 2nd Saturday Ri…
Aug 12 @ 10:00 am – 12:00 pm
Friends on Bikes2nd Saturday Ride Series– – – ✨🌸 SPRING HAS SPRUNG 🌸✨And we are ready to roll into the sunshine. Starting April 9th, join us every second Saturday, late mornings for no-drop, snack-forward, and friendly … Read more
10:00 am Little Brook Neighborhood Cleanup
Little Brook Neighborhood Cleanup
Aug 12 @ 10:00 am – 11:00 am
Monthly 2nd Saturday Neighborhood Cleanup. If you want to help with cutting vegetation, bring your own good gloves and tools.  We have yard waste bags, grabbers, yellow bags for trash,  light weight gloves and vests.And, as … Read more
Aug
13
Sun
9:00 am Mt Baker Hub Alliance 2nd Sunday…
Mt Baker Hub Alliance 2nd Sunday…
Aug 13 @ 9:00 am – 12:00 pm
Every month volunteers gather to collect garbage and help beautify our neighborhood. On average, we collect about 15 bags of garbage per clean up, which means 1,000’s of small pieces of plastic that do not … Read more
Aug
14
Mon
6:00 pm Central Seattle Greenways’ month… @ Zoom
Central Seattle Greenways’ month… @ Zoom
Aug 14 @ 6:00 pm – 8:00 pm
To receive the Zoom link and meeting agendas, visit Central Seattle Greenways’ website at http://centralseattlegreenways.com to subscribe to our Google Group or email us at centralse[email protected]
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…

Latest on YouTube