— Advertisement —

From gravel to pavement: East Lake Sammamish Trail reopening celebration

ELST_EviteKing County Parks is ready to celebrate the opening of the newly-paved East Lake Sammamish Trail between the lake and Issaquah.

Formerly covered by crushed rock, the section is just the second segment in a series of planned paving projects that will one day connect Redmond to Issaquah with a fully accessible trail.

From King County Parks:


— Advertisement —

Join us for a celebration on the trail!

Wednesday, June 12
11 a.m.
East Lake Sammamish Trail terminus
at Gilman Boulevard in Issaquah

King County is delighted to announce another milestone toward completing the East Lake Sammamish Master Plan Trail.

Join us as we cut the ribbon and re-open the newly developed trail segment, a 2.2-mile-long section from SE 43rd Way
to Gilman Boulevard.

The trail has gone from a crushed rock surface to a 12-foot-wide paved trail with 2-foot soft-surface shoulders on each side, making it more accessible to bicyclists, skaters and trail visitors of all ages and abilities. We’ve also improved safety by enhancing intersection and road crossing treatments, among other design improvements. The ELST follows an historic railroad route along the eastern shore of Lake Sammamish and connects the cities of Redmond, Sammamish and Issaquah.

Funding for this project was provided by the 2008-2013, voter-approved Open Space and Trails Levy, the Washington Wildlife and Recreation Program, and the Federal Highway Administration.

Map of the recently-completed segment:


View E Lake Sammamish in a larger map


About the author:


Related posts:

Comments

9 responses to “From gravel to pavement: East Lake Sammamish Trail reopening celebration”

  1. I would love if someday our region could complete the loop of Elliott bay -> Ship Canal -> Burke-Gilman -> Sammamish River -> East Lake Sammamish -> I90 trails, entirely via separated, paved multi-use paths. There are still a few missing links in there, but this project brings us one step closer!

  2. Gary

    About time. Well I wonder if the construction crews had to fight with the homeowners again or have they realized that the trail isn’t the end of the world.

  3. Biliruben

    It looks like they dodged the hard stuff, doing the stretch by the park first, before braving the shotguns and dobermens in the backyards.

  4. Yorik

    Ah, so that explains all the trail closed signs when I rode from Issaquah to Redmond for the first time last week. Good project, but detour signage would’ve helped put me at ease that I wasn’t going to be riding in the road or on the sidewalk the whole way to Redmond.

    1. There really isn’t any alternative other than Lake Sammamish Parkway. I suppose you could take Issaquah-Pine Lake Road and find your way back down to Lake Sammamish Parkway once in Sammamish, or just go around the lake on the west side, but it’s not like that’s going to be much better if at all.

      1. Yorik

        I meant something like, “Trail closed for 1 mile, use road or sidewalk”. It was just a bit disconcerting to not know what was going on.

      2. There were a few signs explaining the project in various places, though probably not the best ones. I’m not sure Lake Sammamish Parkway has much of any sidewalks north of 56th.

  5. Todd

    Hey, Tom, this is approaching fast. You may want to write up a blog story about it:

    http://your.kingcounty.gov/dnrp/library/parks-and-recreation/documents/cip/ELST_North%20Samm_Construction%20Activities.pdf

    Construction is supposed to start the 20th of the month (Febrary, 2014)

    1. Tom Fucoloro

      Thanks! I’ll get an update and see if it’s still on schedule.

— Advertisement —

Join the Seattle Bike Blog Supporters

As a supporter, you help power independent bike news in the Seattle area. Please consider supporting the site financially starting at $5 per month:


Latest stories

Bike Events Calendar

Apr
18
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Apr 18 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Apr
24
Wed
6:00 pm Ballard-Fremont Greenways Meeting
Ballard-Fremont Greenways Meeting
Apr 24 @ 6:00 pm – 7:30 pm
Ballard-Fremont Greenways meets monthly on the 4th Wednesday of the month. Join the google group for monthly meeting information: https://groups.google.com/g/ballard-greenwaysBring your enthusiasm and ideas to share with the group or just stop in to say hello[…]
6:00 pm NE Seattle Greenways Meeting
NE Seattle Greenways Meeting
Apr 24 @ 6:00 pm – 7:00 pm
 ShareMastodonTwitterFacebookRedditEmail
Apr
25
Thu
7:15 pm Point83 @ Westlake Park
Point83 @ Westlake Park
Apr 25 @ 7:15 pm
Point83 @ Westlake Park
Meet up in the center of the park at 7ish. Leave at 730. Every Thursday from now until forever rain or shine. Bikes, beers, illegal firepits, nachos, bottlerockets, timetraveling, lollygagging, mechanicals, good times.ShareMastodonTwitterFacebookRedditEmail
Apr
28
Sun
all-day McClinchy Camano Classic Century @ Stanwood Middle School
McClinchy Camano Classic Century @ Stanwood Middle School
Apr 28 all-day
McClinchy Camano Classic Century @ Stanwood Middle School | Stanwood | Washington | United States
Bike Camano Island for 40th edition of classic ride! The McClinchy Camano Classic Century offers scenic and challenging route options of 103, 65, 50, 35 or 15 miles. Fresh food stops, mechanical support and gourmet[…]
— Advertisements —

Latest on Mastodon

Loading Mastodon feed…